Existing project replacement
Retain the model reference for projects, quotations and maintenance records that already identify U606.
U606 remains an indexed 606 mm profile page for existing project and replacement enquiries. Because the latest 2026 catalog lists SU622 instead of U606, the two models are not treated as interchangeable; structural comparison requires an approved U606 datasheet and project review.
U606 remains an indexed 606 mm profile page for existing project and replacement enquiries. Because the latest 2026 catalog lists SU622 instead of U606, the two models are not treated as interchangeable; structural comparison requires an approved U606 datasheet and project review.
▎Products Description
![]() |
![]() |
![]() |
| River bank protection and regulation | Flood protection structures | Retaining wall |
![]() |
![]() |
![]() |
| Marine structures | Embankment works | Ersosion control |
![]() |
![]() |
![]() |
| Water control solutions | Mat high dams | Cut-off system |
|
Automatic Production lines: The high-speed production line guarantees a monthly output around 25,000 meters,it means we only need 10 days to complete a 40HQ container production. |
Store:
Use pallets to keep the sheet pile from being under heavy pressure when stacked, and use rain cloth to prevent extreme weather from affecting the sheet pile.
![]() |
![]() |
![]() |
|
Loading: The use of tools such as forklifts makes the container loading process convenient and efficient |
▎Send Inquiry
▎Search
▎Category
▎Recommended